Home/Projects

Operating and under-construction projects

Each project's processing capacity, process route, and end use are fully verifiable.

Jinan Biogas Purification Project site Grid-connected
Shandong · Jinan | BOO Model | MSW leachate biogas

Jinan Biogas Purification Project (Shandong)

10,000Nm³/dayBiogas Processing Capacity
96%+CH₄ Purity
PSACO₂ removal process

Feedstock is biogas from MSW leachate anaerobic fermentation. Front-endwet complexed iron + dry iron oxideTwo-stage desulfurization reduces H₂S from >1,000 mg/Nm³ raw gas to trace ppm; back-endPressure Swing Adsorption (PSA) CO₂ removalCompletes CH₄ enrichment. Purified gas is injected via medium-pressure metering skid into the municipal gas pipeline as supplementary fuel for residential and industrial use.

  • desulfurization processwet complexed iron + dry iron oxide
  • CO₂ removal processPSA Pressure Swing Adsorption
  • End UseMedium-pressure grid injection
  • StandardGB/T 41328-2022
Weihai Biogas Purification Project - Adsorption Tower Grid-connected
Shandong · Weihai | BOO Model | Livestock manure anaerobic biogas

Weihai Biogas Purification Project (Shandong)

30,000Nm³/dayBiogas Processing Capacity
96%+CH₄ Purity
HPWSwater scrubbing

Feedstock is biogas from large-scale livestock farm manure anaerobic fermentation. alkaline biological desulfurizationLeverages biological oxidation mechanism — low operating cost; Water Scrubbing (HPWS) CO₂ removalLeverages the solubility difference of CH₄ vs CO₂ in water for separation, while simultaneously deep-removing residual H₂S and NH₃. Forms a closed loop: "manure → biogas → biomethane → long-term grid supply contract."

  • desulfurization processalkaline biological desulfurization
  • CO₂ removal processwater scrubbing (HPWS)
  • End UseMedium-pressure grid injection
  • StandardGB/T 41328-2022
O&M Undertaking

Registered Inspection & O&M Sites

In addition to owned projects, the company undertakes inspection & O&M for the following 4 biogas / biomethane sites via the "StarBiogas Smart Control · Inspection System" platform, all currently in operation.

SiteProject CodePointsFrequencyScheduleCompletion
Dezhou ProjectDZ-0115Every 2 hours2026-07-10 → 2027-07-31100%
Rushan ProjectRS-0114Every 2 hours2026-07-10 → 2027-07-31100%
Laiwu ProjectLW-0114Every 2 hours2026-07-10 → 2027-07-31100%
Changchun ProjectCC-0114Every 2 hours2026-07-10 → 2027-07-31100%
Total—57—386 days100%
Data from "StarBiogas Smart Control · Inspection System" console.Learn about the Inspection System →
Partnership

Have biogas resources? Turn them into biomethane.

Whether new projects or existing site upgrades, we can engage from feasibility — feedstock assessment, process selection, BOO investment partnership, EPC construction, long-term O&M — end-to-end.