Home/Operations Analytics StarBiogas Smart Control System / decisions

Operations Analytics

Consolidates data from process control, inspection, and production ledgers — cross-analyzed by project, time, and metric to support operational decisions.

Operations Analytics Dashboard · OPERATION ANALYTICS Multi-project parallel2 / 6 dimensionLivedataReal-time
Project capacity comparisonData Sources: project design documents
ProjectStatusBiogas Processing CapacityCooperation ModelFeedstock SourceEnd Use
Jinan Biogas Purification (Shandong)Grid-connected10,000 Nm³/dayBOOMSW leachate biogasMedium-pressure grid injection
Changchun Biomethane (Jilin)Grid-connected25,000 Nm³/dayJV BOOMSW leachate biogasCNG Refueling
Weihai Biogas Purification (Shandong)Grid-connected30,000 Nm³/dayBOOManure anaerobic biogasMedium-pressure grid injection
Capacity data comes from project design documents — as-designed and contractually agreed values. Actual load rate, annual output, and monthly trends will refresh monthly after production ledger integration.
Inspection execution analysisData Sources: Inspection System
ProjectPoint CountInspection FrequencySchedule PeriodCompletionDays Remaining
Dezhou Project15Every 2 hours2026-07-10 → 2027-07-31100%359
Rushan Project14Every 2 hours2026-07-10 → 2027-07-31100%359
Laiwu Project14Every 2 hours2026-07-10 → 2027-07-31100%359
Changchun Project14Every 2 hours2026-07-10 → 2027-07-31100%359
Total57——100%—
TOTAL
10,485records
Cumulative inspection records
TODAY
446records
Today's inspection records
ISSUE
2records
issue summary
EVENT
14records
Incidents
Data Sources Process Control System · Inspection System · Production Ledger Update method Capacity disclosed per project · Inspection summarized daily Remaining dimensions integrated once ledger is ready
Analysis Dimensions

Two dimensions launched first — others integrated per data source readiness

Live dimensions already have data available and can be cross-analyzed by project, time, and metric. Pending dimensions have completed schema design — will open once ledger and metering data are uploaded.

Live · READY

01

inspection executionLive

Point coverage, task completion, hazard detection and closed-loop status. Currently 4 projects, 57 points on 2-hour cycles.

  • Task completion rate and on-time rate
  • Hazard detection count and handling rate
  • Personnel workload distribution
02

Capacity and LoadLive

Design capacity, operational status, feedstock source, and end use for each project — from project design documents.

  • Design vs actual processing capacity
  • Operational status and cooperation model
  • Feedstock / Output flow

Pending integration · PIPELINE

03

Energy and CostPending integration

Organization-level gas-generation power consumption, chemicals and steam usage — converted to operating cost.

  • Organizationgas generationpower consumption kWh/Nm³
  • Desulfurizer and amine solution consumption
  • Steam and cooling water consumption
04

mass balancePending integration

Feedstock throughput, gas output, and digestate/slurry production — mass-balance closed-loop accounting.

  • Feedstock intake metering
  • Product output metering
  • By-product and loss accounting
05

equipment reliabilityPending integration

Key unit run hours, fault counts, and mean-time-between-failures.

  • Compressor group run hours
  • Alarm count and category
  • Unplanned shutdown statistics
06

Safety and EnvironmentPending integration

Alarm category statistics, closed-loop hazard remediation, emissions and reduction accounting.

  • Alarms by severity and handling duration
  • Hazard remediation closed-loop rate
  • Carbon emission reduction accounting
The two currently externally-displayable dimensions come from verifiable data sources. The remaining four dimensions have completed schema and metric definitions; external views will open once the business owner provides corresponding ledger data.
Data sources

Three data sources, one analysis view

01

Process Control System

Temperature, pressure, flow, level, and cumulative totals per section, plus alarms & interlocks logs.

  • Biogas inlet and purified gas flow cumulative
  • Each section's operating parameters and trends
  • Alarms by category and handling records
02

Inspection System

Point coverage, task execution, hazard reporting, and personnel workload.

  • Inspection records and completion rate
  • Issues summary and incidents
  • Personnel track and workload
03

production ledger

Feedstock arrivals, product sales, chemicals and energy consumption — offline metering data.

  • Feedstock and product metering tickets
  • Chemicals and spare parts consumption
  • Electricity, steam, water consumption