Operations Analytics
Consolidates data from process control, inspection, and production ledgers — cross-analyzed by project, time, and metric to support operational decisions.
| Project | Status | Biogas Processing Capacity | Cooperation Model | Feedstock Source | End Use |
|---|---|---|---|---|---|
| Jinan Biogas Purification (Shandong) | Grid-connected | 10,000 Nm³/day | BOO | MSW leachate biogas | Medium-pressure grid injection |
| Changchun Biomethane (Jilin) | Grid-connected | 25,000 Nm³/day | JV BOO | MSW leachate biogas | CNG Refueling |
| Weihai Biogas Purification (Shandong) | Grid-connected | 30,000 Nm³/day | BOO | Manure anaerobic biogas | Medium-pressure grid injection |
| Project | Point Count | Inspection Frequency | Schedule Period | Completion | Days Remaining |
|---|---|---|---|---|---|
| Dezhou Project | 15 | Every 2 hours | 2026-07-10 → 2027-07-31 | 100% | 359 |
| Rushan Project | 14 | Every 2 hours | 2026-07-10 → 2027-07-31 | 100% | 359 |
| Laiwu Project | 14 | Every 2 hours | 2026-07-10 → 2027-07-31 | 100% | 359 |
| Changchun Project | 14 | Every 2 hours | 2026-07-10 → 2027-07-31 | 100% | 359 |
| Total | 57 | — | — | 100% | — |
Two dimensions launched first — others integrated per data source readiness
Live dimensions already have data available and can be cross-analyzed by project, time, and metric. Pending dimensions have completed schema design — will open once ledger and metering data are uploaded.
Live · READY
inspection executionLive
Point coverage, task completion, hazard detection and closed-loop status. Currently 4 projects, 57 points on 2-hour cycles.
- Task completion rate and on-time rate
- Hazard detection count and handling rate
- Personnel workload distribution
Capacity and LoadLive
Design capacity, operational status, feedstock source, and end use for each project — from project design documents.
- Design vs actual processing capacity
- Operational status and cooperation model
- Feedstock / Output flow
Pending integration · PIPELINE
Energy and CostPending integration
Organization-level gas-generation power consumption, chemicals and steam usage — converted to operating cost.
- Organizationgas generationpower consumption kWh/Nm³
- Desulfurizer and amine solution consumption
- Steam and cooling water consumption
mass balancePending integration
Feedstock throughput, gas output, and digestate/slurry production — mass-balance closed-loop accounting.
- Feedstock intake metering
- Product output metering
- By-product and loss accounting
equipment reliabilityPending integration
Key unit run hours, fault counts, and mean-time-between-failures.
- Compressor group run hours
- Alarm count and category
- Unplanned shutdown statistics
Safety and EnvironmentPending integration
Alarm category statistics, closed-loop hazard remediation, emissions and reduction accounting.
- Alarms by severity and handling duration
- Hazard remediation closed-loop rate
- Carbon emission reduction accounting
Three data sources, one analysis view
Process Control System
Temperature, pressure, flow, level, and cumulative totals per section, plus alarms & interlocks logs.
- Biogas inlet and purified gas flow cumulative
- Each section's operating parameters and trends
- Alarms by category and handling records
Inspection System
Point coverage, task execution, hazard reporting, and personnel workload.
- Inspection records and completion rate
- Issues summary and incidents
- Personnel track and workload
production ledger
Feedstock arrivals, product sales, chemicals and energy consumption — offline metering data.
- Feedstock and product metering tickets
- Chemicals and spare parts consumption
- Electricity, steam, water consumption