Chintech Innovation · Process Lab ← Back to site All Simulations 中文 Handbook
CHINTECH / PROCESS LAB

From Biogas to Pipeline-Quality Biomethane

Alkaline biological desulfurization → high-pressure water scrubbing → dehydration → gas quality checks

Single-file Demo · Available Offline

10,000–30,000 Nm³/d · H₂S 4,000–8,000 ppm

Simplified Steady-State Model / 2026.10

Product gas volume · Dry gas
—

—

Product CH₄ / CO₂
—

—

Product H₂S · 20℃
—

—

Methane Recovery
—

—

Scenario Demonstration

Two Liquid Circuits, One Product Gas Line

Select equipment for details. Animated particles indicate flow direction; values show the current steady state.
Flow diagram
Alkali-based biological desulfurization and high-pressure water wash process flow The raw material is desulfurized in an alkaline absorption tower, compressed to water wash pressure, decarbonized and deeply dehydrated in water scrubbing, and then inspected for tube installation. The alkaline solution is regenerated independently by aeration and sulfur separation; the water wash water is reused after flash evaporation, air regeneration, and cooling. The flashing vapor returns to the compressor inlet, and the tail gas goes to the treatment interface. 01 / Alkaline Biological Desulfurization 02 / High-Pressure Water Scrubbing 03 / Dehydration · Gas Quality Inspection Raw biogas —— Alkaline Absorber Gas ↑ Liquid ↓ — Treated Gas · Compression Biological Regenerator HS⁻ → S⁰— Lean Alkali Solution ↑ Rich Solution ↓ S⁰ Separation Sulfur Separation Sulfur products / emissions — Compression · Cooling —— Water Scrubber CO₂ → Water ——— Pressure reduction Flash Drum — Water Regenerator Air ↑ Stripping air · independent branch Tail Gas → Treatment — CO₂ / CH₄ / H₂S + stripping air Process water cooling — Circulation Pump Cooled Lean Water ↑ Twin-bed Dryer — Dew Point at Handover Pressure Regulation / Analysis — Grid Connection — Off-spec Gas → Treatment
Main gas / flash gas return Alkali Solution Circulation Process water circulation Air / sulfur side line Regenerated Tail Gas

—

—

Class I gas quality · itemized inspection

GB 17820—2018 + GB/T 41328—2022. Retain the applicable scope and verification boundaries for each item.

—
Quality Project Simulation results Natural gas category 1 / Biogas category 1 Screening Results
—

Gas concentration and heating value reference conditions: 20°C, 101.325 kPa; all components calculated on a dry basis. Dew point is calculated at the selected crossover absolute pressure. H₂, CO, NH₃, Hg, total chlorine, hydrocarbon dew point, siloxanes, particles/oil, etc., which are not calculated, should be confirmed according to applicable standards, receiving pipeline agreements, and measurements; model compliance does not imply permitted pipeline access.

Cooperation

Need a custom simulation for your project?

This page is a public demo. We can build a tailored simulation model calibrated with your feed gas composition, operating conditions, and equipment parameters — for process evaluation, pre-commissioning trials, and operational optimization.